The second floor hallway and northeast classroom room painted and the staircase steps and second floor hallway cleaned, sanded, and re-stained.
July 18th the name of the Facebook page was changed to St. Jerome School and Museum.
July 29th Shelley Bourne from the Mayfield Messenger Newspaper tours the building and prints
An article in the newspaper about the continuing renovation of the school and museum.

A St. Jerome School T-Shirt was designed and produced to be sold at the picnic.